Bear Creek Trail

Bear Creek 03The team created a Trails Master Plan for the Town of Morrison for a multiuse trail along Bear Creek adjacent to the historic downtown area. Over $2.5 million were raised to help build the trail. The master plan included detailed design for a 10’ wide accessible (ADA) trail with rest areas, overlooks, pedestrian bridges, slope stabilization and riparian restoration along the banks of Bear Creek.

The trail follows the north bank of the creek and would serve both bicyclists and pedestrians accessing local and regional parks, restaurants, shops and neighborhoods. The Morrison Trail section is the first link in the Bear Creek Canyon Trail that will eventually connect with Denver’s metro-wide greenway systems.