Town To Lakes Trail Plan

Mission:

Identify and define a feasible alignment for a continuous, multi-use (10’-wide), pedestrian and bicycle trail that connects the existing trail along the San Juan River, near downtown, to Pagosa Lakes—roughly following the Hwy 160 Corridor. Prepare a master plan for the trail that includes suggested trail cross sections, specific alignment, cost estimates and phasing priorities suitable for applying for grants and support to future preparation of construction plans.

Please click on a link below to download a PDF for review.

Final Master Plan Document

Final Plan Graphic

 

Comments? Please email info@walkbikefit.com.